Clearwater Water Department: Meter Install, Hydrant Use 2026

Clearwater Water Department: Meter Install, Hydrant Use 2026

Clearwater, Florida • meter sets, water taps & hydrant meters

Need Construction Water? Request the Meter or Hydrant Setup Before Using the System

Clearwater has separate official workflows for new meter sets and water-main taps and for temporary hydrant meters. These are different from simply starting an existing utility account.

For new construction, renovation or an upgrade, use the City’s Meter Set and Tap Request process for meter sets, backflow sets, fire-line taps and water taps.

For temporary water from a fire hydrant, request an authorized hydrant meter. Clearwater’s code currently requires at least a $500 hydrant-meter deposit plus enough security to cover water and other charges, while unauthorized hydrant use carries a published $500 charge per occurrence.

Reviewed Aug. 21, 2026 City of Clearwater sources 2026 fee change tracked
01

Start here

Clearwater Meter & Hydrant Quick Facts

Utility Customer Service (727) 562-4600 Accounts, meter reading & utility service
Customer service office 100 S. Myrtle Ave. Clearwater, FL 33756
Hydrant-meter deposit $500 minimum Plus security for consumption/charges
Unauthorized hydrant use $500 Published charge per occurrence
Construction

Meter Set & Tap

Use for new meter sets, backflow-device sets, fire-line taps and water taps related to construction, renovation or upgrades.

Temporary water

Hydrant Meter

Use the City’s Hydrant Meter Request process for a new temporary hydrant-meter installation or relocation of an existing hydrant meter.

Engineering data

Hydrant Flow Test

Use the separate flow-test request when you need hydrant pressure/flow information. A flow test is not authorization to take construction water.

Do not open a City hydrant yourself.

Clearwater’s published fee schedule lists unauthorized fire-hydrant use at $500 per occurrence. Use the City’s hydrant-meter process for temporary construction or bulk-water needs.

02

Permanent service

How to Request a New Clearwater Water Meter

The City specifically directs developers, builders and property owners to the Meter Set and Tap Request workflow for new meter sets associated with construction, renovations and service upgrades.

Official service request

Meter Set and Tap Request

Use this route for a water meter set, backflow-device set, fire-line tap or water tap.

Open Clearwater Service Requests
  1. 1

    Confirm the property and project scope

    Identify the exact construction address and whether the project is new construction, a renovation, meter upgrade, separate irrigation service or another utility modification.

  2. 2

    Determine the required meter size

    The approved meter size affects connection charges, impact fees, service-line dimensions, monthly charges and potentially backflow requirements.

  3. 3

    Determine whether a tap already exists

    A meter set on an existing service is different from a project requiring a new tap or lateral from the City water main.

  4. 4

    Select Meter Set and Tap Request

    Open Clearwater’s official service-request page and choose the City’s Meter Set and Tap Request option.

  5. 5

    Submit the requested project information

    Use the permit/project information, service address, meter/tap details and contact information applicable to your project.

  6. 6

    Review the City’s calculated charges

    Meter connection, tap, impact, backflow, fire-line and related fees are separate categories. Do not budget only the meter-set price.

  7. 7

    Pay required charges before City work

    Clearwater’s fee schedule says applicable water connection and tap charges are payable upon application and before the work is completed.

  8. 8

    Coordinate installation and inspection

    Follow the City’s approved meter, service-line, backflow and utility construction standards rather than installing equipment based only on a contractor’s preferred layout.

03

Do not confuse these tasks

New Meter Installation vs. Ordinary Water Turn-On

Existing service

Utility Turn-On

The meter/service already exists and the customer needs active utility service.

  • Handled through Utility Customer Service
  • Account/deposit requirements may apply
  • Current normal-hours water turn-on charge: $50
  • Scheduled to become $60 on Oct. 1, 2026
Call (727) 562-4600
Construction

New Meter / Tap

A meter, service line, tap or related infrastructure must be installed or modified.

  • Use Meter Set and Tap Request
  • Connection charges depend on meter size
  • Tap charges may be additional
  • Impact fees may also apply
See current connection fees
04

New main connection

Clearwater Water-Main Tap Requests

If the property does not already have the required service tap, the project can involve both a tap charge and a meter connection charge.

01 Approved project Permit / construction scope
02 Meter sizing Domestic, lawn or other use
03 Tap requirement Existing or new connection
04 City charges Meter + tap + impact
05 Installation City standards apply
No tap available?

Clearwater’s current fee schedule lists an Install New Lateral Fee of $3,019.78 effective Oct. 1, 2025. It is scheduled to increase to $3,205.00 on Oct. 1, 2026. Project-specific meter, impact and other charges can still apply separately.

Outside Clearwater city limits

The City’s code states that charges for services, pipe and meters outside municipal limits are subject to an additional 25%. Confirm jurisdiction before estimating a project.

05

Current through Sept. 30, 2026

Clearwater Water Meter Connection Fees

The following amounts are from Clearwater’s adopted water-meter connection schedule. Because the City’s next scheduled adjustment begins October 1, both the current and upcoming figures are shown.

Selected Clearwater water-meter connection charges
Meter / Service Current
Oct. 1, 2025
Scheduled
Oct. 1, 2026
Less than 1-inch meter with 3/4-inch service line $663.48 $785.48
1-inch meter with 1-inch service line $759.03 $881.18
1½-inch meter with 1½-inch service line $1,744.19 $2,031.83
2-inch meter with 2-inch service line $2,035.92 $2,332.10
3-inch meter on 6-inch main $5,183.84 $5,513.08
3-inch meter on 8-inch main $5,185.31 $5,513.60
Larger project?

The full City schedule includes additional 3-, 4- and 6-inch configurations and tap charges. Larger meters/taps and certain installations may be charged at cost. Request the actual project calculation instead of multiplying a smaller-meter fee.

06

Separate from meter installation

Clearwater Water Impact Fees

New development can also trigger a water impact fee. This is different from the physical meter-connection charge.

Residential unit $660

Current fee effective Oct. 1, 2025.

Scheduled Oct. 1, 2026: $720
1-inch nonresidential $1,650

Current meter-based equivalent-living-unit fee.

Scheduled Oct. 1, 2026: $1,800
1½-inch nonresidential $3,300

Current published water impact fee.

Scheduled Oct. 1, 2026: $3,600
2-inch compound $5,280

Current published water impact fee.

Scheduled Oct. 1, 2026: $5,760
Do not start impact-fee work first and pay later.

Clearwater’s adopted schedule states that when work requiring an impact fee begins without first paying the required fee, the impact fee can be tripled.

07

Temporary construction water

How to Request a Clearwater Hydrant Meter

MINIMUM SECURITY $500 Plus enough to cover water and other charges
BILLING RATE 2-inch lawn meter Temporary nonpotable hydrant-meter service
UNAUTHORIZED USE $500 Published charge per occurrence

Clearwater’s code describes hydrant-meter service as temporary nonpotable service provided through a temporary meter installed on a fire hydrant.

City hydrant workflow

Hydrant Meter Request Form

The City says this request is used to install a new hydrant meter or relocate an existing hydrant meter.

Find Hydrant Meter Request
  1. 1

    Identify why temporary water is needed

    Hydrant-meter service is intended for temporary use rather than as a replacement for a permanent long-term meter connection.

  2. 2

    Identify the project location

    Have the construction address, site contact and the hydrant/location information needed by the City.

  3. 3

    Open Clearwater’s Hydrant Meter Request

    Use the Utility Customer Service service-orders page and select Hydrant Meter Request Form.

  4. 4

    Choose new installation or relocation

    The City’s request process supports both installation of a new temporary hydrant meter and relocation of an existing one.

  5. 5

    Meet the deposit requirement

    Clearwater’s code requires a minimum $500 deposit plus an amount sufficient to cover anticipated water use and other incurred charges.

  6. 6

    Wait for authorized installation

    Do not attach private equipment to a City hydrant or begin drawing water before the authorized hydrant-meter setup is established.

  7. 7

    Use the meter only at the approved location

    If the project needs water at another hydrant, use the relocation process instead of moving City equipment without authorization.

  8. 8

    Track usage and account charges

    Hydrant-meter water is metered and billed. Budget for consumption rather than treating hydrant water as free construction water.

Do not treat hydrant-meter water as ordinary drinking water.

The Clearwater code categorizes this as temporary nonpotable service. Use it only for the approved purpose and follow any project-specific public-health or construction requirements.

08

Changing jobsite location

How to Relocate a Clearwater Hydrant Meter

1 Do not move it yourself

Leave the City-approved equipment at its authorized location.

2 Submit hydrant-meter request

Select the relocation option for the existing meter.

3 Give old and new location

Provide enough information for Clearwater to identify both hydrants/sites.

4 Wait for City direction

Resume use only after the authorized relocation has been completed.

A hydrant meter does not authorize every hydrant.

The meter/request is associated with an approved temporary service arrangement. Relocate it through the City’s request process rather than attaching it wherever water is convenient.

09

Fire-flow information

Clearwater Hydrant Flow Test Requests

A hydrant flow test is commonly needed for fire-protection design, engineering or development review. Clearwater provides a dedicated Hydrant Flow Test Form.

Purpose Pressure / flow data

Engineering and fire-protection information.

Current fee $151.25

Effective Oct. 1, 2025 through Sept. 30, 2026.

Oct. 1, 2026 $185.00

Scheduled adopted flow-test charge.

Hydrant Flow Test Form

Clearwater lists this as a separate Utility Customer Service request from a Hydrant Meter Request.

Find Hydrant Flow Test
Flow test ≠ hydrant-use permit.

A flow test provides system data. If you actually need temporary project water, request the hydrant meter separately.

10

Protect the public system

Backflow Device Sets & Meter Installations

Clearwater’s meter/tap request specifically includes backflow-device sets. The required arrangement depends on the service, meter size and project.

Typical project questions

  • Domestic or irrigation service?
  • Commercial or residential use?
  • Fire-line connection?
  • Existing meter or new meter?
  • Existing tap or new water-main tap?
  • What meter size is approved?

Why approval matters

  • Backflow devices protect drinking-water distribution
  • Meter/set dimensions are standardized
  • Right-of-way location matters
  • Accessibility for meter reading matters
  • Fire and domestic service have different requirements
  • Incorrect work may have to be rebuilt
Clearwater Construction & Design Standards

The City publishes standard details for meter sets, backflow preventers, fire hydrants, compound meters, fire lines, valves, trenching and water taps.

View Design Standards
11

Cost & capacity

Why Clearwater Meter Size Matters

Connection cost Increases with size

Large meter/service configurations cost substantially more to install.

Impact fee Can increase

Nonresidential water impact fees use equivalent-living-unit calculations tied to meter size.

Monthly bill Base charges vary

Meter size can affect recurring water availability charges.

Backflow Configuration varies

Larger and specialized services can require different assemblies.

Do not oversize a meter “just in case.”

Have the project’s engineer, plumber or approved design establish the service requirement. A larger meter can raise both installation and recurring costs.

12

Important date

Clearwater Fees Change October 1, 2026

Water turn-on $50 → $60
≤2″ accurate meter test $162.50 → $200
1″ upsize/downsize $352.50 → $450
Hydrant flow test $151.25 → $185
New lateral $3,019.78 → $3,205
Unauthorized hydrant use $500 → $500
Project crosses October 1?

The amount due can depend on when the applicable request/payment is processed. Do not assume an August estimate will remain valid for work applied for after the new schedule takes effect.

13

Choose correctly

Hydrant Meter vs. Hydrant Flow Test vs. New Hydrant

Temporary water

Hydrant Meter

You need to withdraw metered water temporarily for an approved project.

Use: Hydrant Meter Request
Engineering

Hydrant Flow Test

You need pressure/flow information for engineering, fire protection or development analysis.

Use: Hydrant Flow Test Form
Infrastructure

New Fire Hydrant

The development requires a new permanent hydrant or associated water-main construction.

Coordinate with Public Utilities / project review
New permanent hydrant price:

Clearwater’s fee schedule states that the fire-hydrant installation charge is determined by the Water Division based on current market pricing. Additional piping, restoration, materials or labor can increase the project cost.

14

Protect City infrastructure

What Counts as Unauthorized Hydrant or Meter Use?

01 Opening a hydrant without authorization

Use the City’s temporary hydrant-meter process instead.

02 Bypassing a water meter

Clearwater separately lists charges for bypassing metered service.

03 Breaking meter stop locks

Current published stop-lock charge is $81.25 through Sept. 30, 2026.

04 Tampering with City equipment

Repair/replacement costs can include labor and materials.

Unauthorized water-system use is also listed at $500 per occurrence.

Construction schedules do not create permission to bypass the City’s meter, tap or hydrant procedures.

15

Once service is active

How Metered Clearwater Water Is Billed

Clearwater water use is measured from the meter and shown on the customer’s utility bill. The City’s current bill guide states that 1 billing unit equals 748 gallons.

1 CCF / unit 748 gallons

Clearwater’s utility bill converts meter consumption into billable usage.

Hydrant meter Metered usage

Temporary hydrant service is not unmetered free water.

Outside city 25% surcharge

Applicable outside-city utility charges can be higher.

Current Clearwater Utility Rates

Use the City’s rate page for current water, wastewater, reclaimed, stormwater and related recurring charges.

Check Current Rates
16

Who handles what?

Clearwater Water Department Contacts

Accounts & service orders

Utility Customer Service

Municipal Services Building
100 South Myrtle Avenue
Clearwater, FL 33756

Regular hours Monday–Friday, 8 AM–5 PM
Lobby assistance 8 AM–4 PM
Water system / engineering

Clearwater Public Utilities

1650 N. Arcturas Ave.
Building C
Clearwater, FL 33765

Public Utilities (727) 562-4960
Meter / tap forms City online service requests
Construction standards Public Works standard details
Existing account turn-on Utility Customer Service
New meter set Meter Set and Tap Request
New water-main tap Meter Set and Tap Request
Temporary hydrant water Hydrant Meter Request
Move hydrant meter Hydrant Meter Request
Fire-flow data Hydrant Flow Test Form
17

Customer-service location

Map to Clearwater Utility Customer Service

Municipal Services Building

100 South Myrtle Avenue

Clearwater, FL 33756

Utility Customer Service:
(727) 562-4600

Customers visiting the Municipal Services Building should check in with security.

Open Google Maps
18

Before submitting

Clearwater Meter / Hydrant Project Checklist

Confirm the project is actually served by the City of Clearwater.

Know whether you need permanent service or temporary water.

Know the approved water-meter size.

Confirm whether an existing service tap is available.

Check whether backflow equipment is required.

Use Meter Set and Tap Request for permanent meter/tap work.

Use Hydrant Meter Request for temporary hydrant water.

Use Hydrant Flow Test Form only when flow data is needed.

Budget separate meter, tap, impact and related fees.

Check whether the Oct. 1, 2026 fee schedule affects the project.

Do not move or operate City hydrant equipment without authorization.

Keep request IDs, receipts and City approvals with the project file.

19

Troubleshooting

Meter or Hydrant Request Delayed? Check These

  1. Wrong request type A normal account turn-on request will not replace a Meter Set and Tap Request.
  2. Meter size not approved The City needs the correct service configuration before final charges and installation.
  3. New tap required An existing meter location may not have the tap/service needed for the proposed project.
  4. Impact fee outstanding New development can have impact fees separate from installation fees.
  5. Backflow detail incomplete Required backflow-device information may need to be resolved before installation.
  6. Permit/project mismatch Make sure the utility request matches the approved construction scope.
  7. Hydrant location unclear Temporary-water requests need a specific approved hydrant/project location.
  8. Hydrant meter needs relocation Submit the relocation request instead of moving equipment in the field.
  9. Payment not posted Verify required City charges/deposits have been received.
  10. Status still unclear Call Utility Customer Service at (727) 562-4600 with the service address and request information.
20

Understand the process

Clearwater Meter & Hydrant Terms

Meter Set
The City-approved physical water-meter assembly installed for a service connection.
Water Tap
The physical connection from the service line to the City water main.
Impact Fee
A separate development-related charge intended to address additional demand placed on the water system.
Hydrant Meter
A temporary meter installed on a fire hydrant for authorized temporary nonpotable water service.
Hydrant Flow Test
A test used to obtain fire-hydrant flow and pressure information; it does not authorize ongoing withdrawal of water.
Backflow Preventer
An assembly intended to keep potentially contaminated or nonpotable water from flowing backward into the drinking-water system.
Fire-Line Tap
A City water-main connection serving an approved fire-protection system.
Temporary Nonpotable Service
Clearwater’s code classification for temporary hydrant-meter water service.
New Lateral
A new service connection/lateral installed where the required existing tap is unavailable.
Turn-On Fee
A service charge for activating an existing water-meter or reclaimed-water connection; it is distinct from a new meter installation charge.
21

Frequently searched

Clearwater Water Department FAQs

How do I request a new water meter in Clearwater?

Use Clearwater’s Meter Set and Tap Request process for a new meter set related to construction, renovation or an upgrade. The same request route covers backflow-device sets, fire-line taps and water taps. Meter size, tap availability, impact fees and construction details can affect the total cost.

How much does a new Clearwater water meter cost in 2026?

Through September 30, 2026, selected City connection charges are $663.48 for a less-than-one-inch meter with a 3/4-inch service line, $759.03 for a 1-inch meter with 1-inch service, $1,744.19 for a 1½-inch meter and $2,035.92 for a 2-inch meter. Scheduled higher amounts take effect October 1, 2026. Tap, impact, backflow and other project charges may be additional.

How do I get temporary water from a Clearwater fire hydrant?

Use the City’s Hydrant Meter Request Form rather than operating a hydrant directly. Clearwater provides the form for installation of a new temporary hydrant meter or relocation of an existing hydrant meter.

How much is the Clearwater hydrant-meter deposit?

Clearwater’s code requires a minimum $500 deposit for temporary nonpotable hydrant-meter service plus an amount sufficient to cover the cost of water consumed and other charges incurred.

What happens if I use a Clearwater fire hydrant without permission?

The City’s current published fee schedule lists unauthorized use of a fire hydrant at $500 per occurrence. Clearwater also separately lists a $500 charge for unauthorized water-system use.

Can I move a Clearwater hydrant meter to another hydrant myself?

Use the City’s Hydrant Meter Request process to request relocation of an existing hydrant meter. Do not treat an approved hydrant meter as permission to attach it to any City hydrant you choose.

What is the difference between a hydrant meter and a hydrant flow test?

A hydrant meter provides authorized temporary metered water for an approved project. A hydrant flow test provides system pressure and flow information for engineering or fire-protection purposes. A flow-test request does not authorize continued construction-water use.

How much is a Clearwater hydrant flow test in 2026?

The adopted City fee is $151.25 from October 1, 2025 through September 30, 2026. The scheduled charge increases to $185 on October 1, 2026.

Do Clearwater water impact fees come with the meter installation price?

No. Water impact fees are a separate development-related charge from meter connection and tap charges. For example, the currently published residential water impact fee is $660 through September 30, 2026 and is scheduled to become $720 on October 1, 2026.

Who do I call about Clearwater meter or hydrant service?

Call Clearwater Utility Customer Service at (727) 562-4600 for account and service-order questions. Clearwater Public Utilities can be reached at (727) 562-4960 for utility-system matters. The Utility Customer Service office is at 100 South Myrtle Avenue, Clearwater, Florida 33756.

22

Official verification

Official Clearwater Meter & Hydrant Resources

Public Utilities

City water-system information, utility services and links to meter/tap and hydrant resources.

Clearwater Public Utilities

Utility Customer Service

Meter reading, billing, utility startup, account activity and service-order resources.

Utility Customer Service

Meter Set & Tap Request

Official service-request route for meter sets, backflow sets, fire-line taps and water taps.

Open Service Requests

Hydrant Meter Request

Use Clearwater’s service-order area to select the Hydrant Meter Request Form for a new installation or relocation.

Hydrant / Service Orders

Construction Standards

Official meter, backflow, hydrant, valve, fire-line, tap and utility construction details.

Construction Standards

Current Utility Rates

Current recurring water rates, utility charges and selected service fees.

Current Utility Rates
Planning work after September 30, 2026?

Recheck the City’s current fee schedule before submitting. Clearwater already has scheduled October 1, 2026 increases for multiple meter, connection, impact and hydrant-flow charges.