Independent water-service guide: WaterDepartmentGuide.org is not operated by or affiliated with the City of Portsmouth, New Hampshire, Portsmouth Department of Public Works or Portsmouth Water Division. New connections involve property-specific engineering, fees and inspections. Use the official City application and DPW instructions linked below for final approval.
Portsmouth Water Department New Service: Apply & Setup 2026
Apply for Portsmouth Water Service Without Missing a Permit, Fee or Inspection Step
Portsmouth now processes Domestic Water Service Applications online through its City permitting system. The City’s current application procedures were revised July 1, 2026.
If you are simply moving into an existing metered property, start with the Water/Sewer Billing Office. If you are installing a brand-new physical connection to a City water main, you need the DPW new-service permitting and inspection process.
Start here
Portsmouth Water Department New Service Quick Facts
Portsmouth DPW states that a complete application must be submitted through the City’s online permitting platform. If the submission is complete, the applicant proceeds to project review, required fees, construction and City inspection.
Important distinction
Do You Need an Account Setup or a Brand-New Water Connection?
Water Line & Meter Already Exist
You are usually dealing with account setup, billing or a service turn-on, not construction of a new service line.
- Home purchase or rental
- Existing water meter
- Existing service pipe
- Changing account responsibility
- Need water turned on
Start with: Water/Sewer Billing Office at 603-610-7248 or 603-610-7237.
Existing-property setup steps →New Connection to the Water Main
You need the Domestic Water Service Application process when creating a new service connection or completing qualifying service construction.
- New building
- New domestic service
- New connection to City main
- Relocated water service
- Development requiring new infrastructure
Start with: Portsmouth DPW online permitting.
New-connection application steps →A customer moving into a property with an existing service is different from a contractor or developer installing a physical connection to the City’s water distribution system.
Official FY27 workflow
How to Apply for a New Portsmouth Water Service Connection
Domestic Water Service Application
Portsmouth’s DPW Forms & Permits page routes new domestic water service applications into the City’s online permitting platform, where applicants can submit, track status and receive application updates.
-
1
Open Portsmouth’s official DPW permitting page
Choose Domestic Water Service Application. The City states that applications are now submitted through its online permitting system.
-
2
Create/sign into the permitting account
Follow the portal’s current registration instructions and keep the email address accessible because application status and review notices can be delivered electronically.
-
3
Complete every requested project field
Provide the property, applicant, contractor, proposed service and supporting information required for the specific project. Upload plans or technical documents when applicable.
-
4
Submit the complete application
The City’s July 1, 2026 instructions say incomplete applications are placed on hold until required information is provided.
-
5
Complete the DPW project review
When the submission is complete, the applicant is directed to coordinate with Portsmouth Water/Sewer staff to discuss the project and required work.
-
6
Pay required fees before approval
The application fee, applicable capacity surcharge and construction-related charges must be paid before the Water Service can receive final approval.
-
7
Receive approval before beginning regulated work
After required project review and payment, the application can be finalized and approved work can proceed according to DPW requirements.
-
8
Schedule tapping and inspection
The water-main tap must be coordinated in advance and the tap/service installation must be tested and inspected by the City before the work is backfilled.
-
9
Establish the Water/Sewer Billing account
The City’s meter instructions state that the billing account must be established before meter installation is scheduled.
-
10
Have the meter set and service activated
Prepare the interior meter piping correctly, coordinate with the Meter Department and complete the City’s meter installation/turn-on process.
Portsmouth requires the relevant pipe, bedding, connections and tracer wire where applicable to remain visible. If required work is covered before inspection, the contractor may be required to excavate it again.
Prepare before submitting
Portsmouth New Water Service Application Requirements
The exact submission depends on project size and complexity. Portsmouth DPW may require additional material when necessary to clearly show the proposed work.
Property & Applicant
- Service/property address
- Owner/applicant information
- Project contact information
- Authorized contractor information
Service Details
- Domestic service type
- Requested service size
- Meter requirements
- Existing versus proposed service
- Relocation/abandonment information if applicable
Plans & Engineering
- Site/utility plans when required
- Water-demand information
- Fire-service information if applicable
- Irrigation information if applicable
- Additional DPW-requested details
The City’s 2026 procedure specifically states that an incomplete submission is placed on hold. A clean application with the requested plans and service data can prevent avoidable review delays.
New development
Does Your Project Need an “Ability to Serve” Letter?
Portsmouth states that development requiring a connection to the City water distribution system requires an Ability to Serve letter from DPW. More complex projects can trigger additional engineering review.
Projects likely to need deeper review
- Subdivision projects
- Multi-building developments
- Projects with multiple services
- Large water demands
- Water-main alterations
- Water-main extensions
- Complex fire-service requirements
DPW may require
- Engineer-stamped subdivision/site plans
- Water demand projections
- Domestic demand details
- Irrigation demand details
- Fire protection demand
- Hydraulic analysis
- Local or state approvals
Portsmouth’s development requirements call for separate considerations, including independent fire/domestic service connections and shutoff valves in applicable projects. Irrigation systems can require a separate meter and backflow protection.
2026 setup costs
Portsmouth New Water Service Fees in 2026
The City’s July 1, 2026 Domestic Water Service Application instructions identify these key new-service charges.
The $300 application fee and $90 meter installation charge are only two parts of the potential project cost. The City also requires applicable capacity surcharge fees and other costs associated with the construction before approval.
Temporary construction / hydrant meter costs
$150 Application Fee
Portsmouth’s current water-service instructions list a $150 temporary meter rental application fee.
$1,500 Deposit
A $1,500 check deposit is required for the temporary meter and backflow equipment under the current instructions.
Water Use + Rental
The City’s hydrant-meter information also states that water usage and the applicable rental charge are billed separately.
Portsmouth’s July 2026 domestic water-service procedure states that capacity surcharge fees do not apply to fire service or irrigation meters.
Who can perform the work
Portsmouth Water Service Contractor Rules
A new service connection is not ordinary homeowner excavation work. Portsmouth applies contractor and tapping requirements to protect the public water system.
- Excavation contractor license required. Water service excavation must be completed by a contractor with an active City of Portsmouth Excavation Contractor License.
- The excavation license is renewed annually. Confirm that the contractor’s City approval is current before scheduling the work.
- Water-main tapping requires specific DPW approval. Portsmouth states that water services may only be tapped by a contractor pre-approved by DPW specifically for water-main tapping.
- Relocated services must be abandoned properly. When moving a water service, the original service must be properly abandoned by the contractor/owner.
- A construction supervisor must be present for inspection. Coordinate staffing so the City’s inspection is not delayed.
Confirm the contractor approvals required for excavation, main tapping and any associated street work before beginning the project.
Installation specifications
Key Portsmouth Water Service Construction Rules
| Requirement | Current Portsmouth guidance | Why it matters |
|---|---|---|
| Excavation | Active City excavation contractor required | Do not schedule unauthorized excavation |
| Backfill bedding | 6 inches of sand bedding to 1 foot over the pipe | Protects installed service line |
| Fill | Clean sand/gravel, 3/4-inch or less, with applicable surface restoration requirements | Must meet City specifications |
| Compaction | Fill compacted in 1-foot lifts | Reduces settlement problems |
| 4-inch and larger service | Ductile iron pipe | Current City specification |
| 2-inch and smaller service | Copper, or approved plastic pipe | Plastic requires City approval |
| Approved plastic service | Trace wire and marking tape required | Must remain visible for inspection |
| Finished depth | At least 5.5 feet below final grade under current instructions | Cold-climate installation requirement |
The City’s July 2026 instruction sheet specifically describes materials for services of 4 inches and larger and 2 inches and smaller. For an intermediate or unusual service size, obtain project-specific direction from DPW rather than assuming a pipe material.
Before backfilling
Portsmouth Water Service Inspection & Testing
The inspector needs to see
Pipe
Do not cover the installed service before required inspection.
Bedding
Required bedding must remain visible for City review.
Connections
Connections and tapping work must be accessible for inspection.
Tracer Wire
Required when approved plastic service piping is used.
Portsmouth’s 2026 instructions require bacteria and pressure tests for a water service up to 2 inches when the service exceeds 100 feet, and for service pipe larger than 2 inches.
The City’s procedure states that if the inspection cannot be completed because required materials are not exposed, the contractor will be required to excavate the ditch for proper inspection.
Water-main connection
Scheduling the Portsmouth Water Main Tap
Once the required fees are paid and the application is approved, the contractor can coordinate the water-main tapping with Portsmouth DPW.
-
1
Confirm application approval
Do not schedule a tap based solely on application submission.
-
2
Confirm all required fees are paid
The City’s instructions require fees to be paid before final approval.
-
3
Coordinate at least one week in advance
Portsmouth’s July 2026 instructions state that tapping must be coordinated with the Water/Sewer General Foreman at least one week before the work.
-
4
Keep the installation available for inspection
The tap and service line must be tested and inspected before backfilling.
680 Peverly Hill Road, Portsmouth, NH 03801.
Final setup stage
Portsmouth Water Meter Installation & Account Setup
Portsmouth’s July 2026 instructions require the building’s piping to be ready to accept the meter before installation is scheduled. The water billing account must also already be established.
Portsmouth’s current instructions say the City supplies the meter and connection spuds/flanges and bills the owner for them on the first water bill. The City specifically notes that it does not use meter horns.
Meter setting distances in the 2026 instructions
| Meter Size | Setting Distance | Planning Note |
|---|---|---|
| 5/8 inch | 7 1/2 inches | Prepare plumbing before installation |
| 3/4 inch | 9 inches | Prepare plumbing before installation |
| 1 inch | 10 3/4 inches | Prepare plumbing before installation |
| 1.5 inch | 13 inches | Prepare plumbing before installation |
| 2 inch | 17 inches | Prepare plumbing before installation |
| 3 inch | Call DPW | Obtain project-specific setting requirement |
Moving into a home or business
Starting Water at an Existing Portsmouth Property
If the building already has a City water connection and meter, you generally do not need to construct another domestic service. Your immediate tasks are account establishment, billing responsibility and any required turn-on/service request.
-
1
Call the Water/Sewer Billing Office
Contact 603-610-7248 or 603-610-7237 and explain that you need to establish responsibility for an existing Portsmouth service.
-
2
Give the exact property address
Ask staff what ownership, tenant or account documentation applies to your situation.
-
3
Confirm whether the water is physically on
If the property needs a plumbing shutoff or turn-on, Water Division maintenance handles service requests at the property.
-
4
Confirm the billing start point
Ask when responsibility begins and whether a meter reading or other account action is needed.
-
5
Enroll in online billing/payment tools after setup
Once the account exists, use the City’s online bill-payment service for viewing bills, one-time payments and supported automatic-payment features.
The Water Division lists maintenance/service-request hours of 7:30 a.m.–3:30 p.m., Monday through Friday at the Public Works Building, 680 Peverly Hill Road. Main number: 603-427-1530.
After service begins
Portsmouth Water/Sewer Billing Office
Billing Office
Portsmouth City Hall
1 Junkins Avenue, Room 304
Portsmouth, NH 03801
Phone:
603-610-7248
Alternate:
603-610-7237
Billing Office Hours
- Monday: 8:00 a.m.–6:00 p.m.
- Tuesday: 8:00 a.m.–4:30 p.m.
- Wednesday: 8:00 a.m.–4:30 p.m.
- Thursday: 8:00 a.m.–4:30 p.m.
- Friday: 8:00 a.m.–1:00 p.m.
After setup
Portsmouth FY27 Water & Sewer Rates Effective July 1, 2026
Once new service is active, ongoing bills include a monthly fixed charge based on meter size plus usage charges. Portsmouth moved to its FY27 tiered structure effective July 1, 2026.
| Monthly Usage Tier | Water Rate | Sewer Rate |
|---|---|---|
| Tier 1: 0–5 units | $4.56 per unit | $17.47 per unit |
| Tier 2: 6–10 units | $6.17 per unit | $20.03 per unit |
| Tier 3: Over 10 units | $7.61 per unit | $23.01 per unit |
The City says a typical residential customer using 5 units monthly pays about $129.13 per month for combined water and sewer service under FY27 rates.
FY27 monthly fixed service charge
| Meter Size | Water Fixed Charge | Sewer Fixed Charge |
|---|---|---|
| 5/8″ & 3/4″ | $10.94 | $8.04 |
| 1″ | $18.23 | $13.40 |
| 1.5″ | $36.47 | $26.81 |
| 2″ | $58.35 | $42.89 |
| 3″ | $127.64 | $93.83 |
| 4″ | $218.82 | $160.85 |
The application, capacity, construction and meter-setting costs are setup costs. Once service is active, the account also receives the normal monthly fixed and usage charges.
Separate service need
Adding an Irrigation Meter to a Portsmouth Property
An irrigation meter is handled differently from an ordinary new domestic meter. Portsmouth requires irrigation-meter applications to be reviewed and approved through its Water/Meter Department process.
Separate Meter
Qualifying irrigation systems use a separate meter so irrigation consumption can be billed using irrigation rates.
Backflow Protection
Portsmouth requires backflow protection for irrigation systems to reduce contamination risk from cross-connections.
Separate Application
Do not assume the domestic water-service permit automatically authorizes a new irrigation meter.
Commercial / development projects
New Portsmouth Fire Service Connection
Portsmouth lists Fire Service Application separately from the Domestic Water Service Application on the DPW permitting page.
- Use the correct Fire Service application. Do not submit a domestic-only application when the project requires a dedicated fire connection.
- Coordinate fire demand during project review. Complex development review can require the proposed fire-service size and fire-protection demand.
- Separate domestic and fire connections may be required. Portsmouth’s development guidance calls for separate fire and domestic service connections with independent shutoff valves in applicable developments.
- Capacity surcharge treatment is different. The City’s 2026 domestic service instructions state that capacity surcharge fees do not apply to fire service.
Regional system
Where the Portsmouth Water Division Provides Service
The Portsmouth regional water system serves more than just the City itself. The Water Division identifies service to:
Portsmouth
Core City service area.
Pease Tradeport
Separate system considerations can apply.
Newington
Portions served by Portsmouth system.
New Castle
Part of the regional service network.
Greenland
Portions receive Portsmouth water.
Rye
Only portions are served.
Madbury
Only portions are served.
Property-specific eligibility
Confirm whether the exact parcel can connect before designing a project.
System boundaries, main availability, capacity, engineering requirements and local approvals can affect whether and how a specific property receives new service.
Call the right person
Portsmouth Water Department New Service Contacts
| Need | Portsmouth Contact | Phone |
|---|---|---|
| General DPW / emergency / water questions | Department of Public Works | 603-427-1530 |
| Water/Sewer billing account | Billing Office | 603-610-7248 / 603-610-7237 |
| New service / inspections / pressure | Doug Sparks, Water/Sewer/Stormwater General Foreman | 603-766-1409 |
| Water field operations | Jason Beevers, Water Foreman | 603-766-1439 |
| Meter / backflow | Jim Siegel, Meter/Backflow Foreman | 603-766-1443 |
| Water supply / quality | Water Resource Division | 603-427-1530 |
If a direct staff number changes or you are unsure who owns the next step, call 603-427-1530 and ask for new domestic water service assistance.
Project coordination
Portsmouth Department of Public Works Location & Hours
Department of Public Works
680 Peverly Hill Road
Portsmouth, NH 03801
Phone: 603-427-1530
General Water / Maintenance Hours:
Monday–Friday, 7:30 a.m.–3:30 p.m.
Water/Sewer Billing Office
Portsmouth City Hall
1 Junkins Avenue, Room 304
Portsmouth, NH 03801
Phone:
603-610-7248
603-610-7237
Use City Hall for billing/account matters rather than going to DPW for a routine account question.
Prevent delays
Common Portsmouth New Water Service Mistakes
- Using the wrong process. Moving into an existing connected property is not the same as constructing a new domestic service.
- Submitting an incomplete application. Portsmouth places incomplete submissions on hold.
- Starting excavation before approval. Application submission alone is not authorization to begin regulated work.
- Hiring a contractor without the required City license. Confirm active Portsmouth excavation approval.
- Using a contractor not approved to tap the water main. Main tapping has an additional DPW approval requirement.
- Forgetting the capacity surcharge. The basic application charge is not the entire cost of a new service.
- Covering the pipe before inspection. Required work must remain exposed.
- Scheduling tapping too late. The City’s current instructions call for at least one week of advance coordination.
- Not preparing the meter piping. Interior piping must be ready before the City sets the meter.
- Forgetting to establish the billing account. The account must exist before meter installation under the City’s current setup instructions.
Project sequence
Portsmouth New Water Service Setup Timeline
Project complexity, application completeness, engineering review, contractor availability, payment, tapping coordination, inspection and testing can all affect the schedule. Build the project around required approvals rather than assuming a fixed activation date.
Understand the process
Portsmouth New Water Service Terms
- Domestic Water Service
- The water service supplying normal building plumbing uses rather than a dedicated fire or irrigation service.
- Water Main Tap
- The physical connection made to the public water main for the new service line.
- Capacity Surcharge
- A new-service charge associated with capacity demands on the Portsmouth water/sewer systems. Applicable amount depends on the project/service configuration.
- Ability to Serve Letter
- DPW determination used for development projects requiring connection to the Portsmouth water distribution system.
- Service Line
- The piping carrying water from the public distribution system toward the customer’s property plumbing.
- Backflow Device
- A protective device designed to prevent reverse flow that could contaminate the public drinking-water system.
- Tracer Wire
- Locating wire required with approved plastic service pipe under Portsmouth’s current specifications.
- Meter Set
- The City process of installing/setting the water meter after the account and meter location are ready.
- Excavation Contractor License
- City authorization required for contractors performing qualifying water-service excavation.
- FY27
- Portsmouth fiscal-year rate and fee period beginning July 1, 2026.
Official City resources
Portsmouth New Water Service Forms & References
People also ask
Portsmouth Water Department New Service FAQs
1. How do I apply for new water service in Portsmouth, New Hampshire?
For a brand-new physical water connection, use the City of Portsmouth Department of Public Works Forms & Permits page and submit the Domestic Water Service Application through the City’s online permitting system. Portsmouth’s current procedure requires a complete application, DPW review, payment of applicable fees, approval, construction and City inspection.
2. Do I need a new water service application if I am just moving into an existing Portsmouth house?
Usually not if the property already has an established water connection and meter. Start with the Water/Sewer Billing Office at 603-610-7248 or 603-610-7237 to determine the account setup and service-turn-on requirements for the existing property.
3. How much is the Portsmouth new water service application fee in 2026?
Portsmouth’s July 1, 2026 Domestic Water Service Application instructions list a $300 Domestic and Fire Service Application Fee per service. Additional capacity surcharge, construction, meter and other project-related costs can also apply.
4. How much does Portsmouth charge to turn on and set a new water meter?
The City’s July 2026 instructions list a $90 Meter Installation, identified as “Turn On & Set Meter,” fee per service. The City also supplies the meter and connection spuds or flanges, with those items billed to the owner on the first water bill.
5. What is the Portsmouth Water Department phone number for new service?
The Portsmouth Department of Public Works main number is 603-427-1530. The Water/Sewer Billing Office can be reached at 603-610-7248 or 603-610-7237. Current City contact information also lists direct staff numbers for service inspections, meter and field-operation questions.
6. Can any contractor install a new Portsmouth water service?
No. Portsmouth requires water-service excavation to be performed by a contractor with an active City Excavation Contractor License. Water-main tapping may only be performed by a contractor specifically pre-approved by DPW for tapping water mains.
7. Does Portsmouth inspect the new water line before it is buried?
Yes. The City’s current instructions require the service installation to be tested and inspected before backfilling. The pipe, bedding, connections and tracer wire where applicable must remain visible. Covered work may have to be re-excavated for inspection.
8. When can the water main tap be scheduled?
After the required fees have been paid and the water-service application has been approved. Portsmouth’s July 2026 procedure states that the tapping must be coordinated with the Water/Sewer General Foreman at least one week before the work.
9. Does a new Portsmouth development need an Ability to Serve letter?
Portsmouth states that development requiring connection to the City water distribution system requires an Ability to Serve letter from DPW. Complex developments may also need engineering plans, water-demand projections, hydraulic analysis and additional project-specific approvals.
10. Where is the Portsmouth, NH Water Department / DPW located?
The Portsmouth Department of Public Works is at 680 Peverly Hill Road, Portsmouth, NH 03801. Its main phone number is 603-427-1530. Water/Sewer billing is handled separately at Portsmouth City Hall, 1 Junkins Avenue, Room 304.