Need Water Service? First Determine Whether You Need an Account, a Water Tap or a New Service Line

The Mount Vernon Board of Water Supply operates the City’s water system, maintains approximately 105 miles of mains and 1,140 hydrants, makes taps for domestic and industrial customers, maintains meters and handles water billing.

A property with an existing usable water service may only require an Application for Service. New construction or a property without a usable connection can involve a physical water-main tap, plumbing permit, street-opening permit and Board of Water Supply requirements.

Reviewed August 21, 2026 Mount Vernon, New York Official City + municipal-code sources
Board of Water Supply

(914) 668-7820 · City Hall, 1 Roosevelt Square, Room 2 · Monday–Friday, 8:30 AM–4:30 PM

01

Do this before anything else

Do You Need New Water Service or a New Physical Connection?

Do not automatically order a new tap just because you are a new owner or occupant.

First determine whether the property already has a Board of Water Supply service line, curb valve and meter. If the physical connection already exists and can be used, the customer-service process can be much simpler than building a new connection.

Existing service

Existing House or Building

The premises already has a water line and meter or a previously used Board connection.

Likely starting point:
  • Complete the Board’s Application for Service.
  • Confirm account and meter status.
  • Ask whether a turn-on or inspection is needed.
See Application Steps
Construction

No Existing Usable Connection

A new building, redevelopment or disconnected property requires physical connection work.

Potential requirements:
  • Board of Water Supply tap approval
  • Plumbing permit
  • Street-opening permit
  • Licensed contractor
  • Inspection / restoration
See Connection Workflow
Repair

Existing Service Line Is Leaking

Responsibility depends on where the leak occurs.

Board responsibility:

Main to curb valve.

Customer responsibility:

Curb valve toward the meter/property.

See Responsibility Guide
Best first call:

Before excavating or applying for permits, call the Board of Water Supply at (914) 668-7820 and ask whether the property has an existing service, meter and curb connection and whether the project requires a new tap.

02

Quick reference

Mount Vernon Water Department Quick Facts

Water utility Board of Water Supply City of Mount Vernon, NY
Water phone (914) 668-7820 Service + water issues
Customer office Room 2 1 Roosevelt Square
Office hours 8:30–4:30 Monday through Friday
Water mains ≈105 miles
Fire hydrants ≈1,140
Posted water rate $4.30 / 100 cu ft
Minimum posted charge $64.50
03

Existing connection / new account

Mount Vernon Board of Water Supply Application for Service

Official City document

Board of Water Supply Application for Service

The City’s Water Department page directly publishes an official Application for Service PDF. Use the Board’s current form rather than a generic utility application downloaded elsewhere.

Open Official Application
  1. 1

    Confirm the service address

    Make sure the property is within the Mount Vernon Board of Water Supply system and determine whether an existing service connection is present.

  2. 2

    Download the current Board application

    Use the form linked from the City’s Water Department page so you are working from the Board’s own application.

  3. 3

    Complete the requested customer and property information

    Do not leave required fields blank. If ownership, tenancy, meter status or service status is unclear, ask the Board before submitting.

  4. 4

    Ask whether supporting documents are required

    The public Water Department page links the application but does not publish a complete universal checklist for every property type. Call the Board to confirm current identification, ownership, meter or construction documentation applicable to your property.

  5. 5

    Confirm whether the meter and curb service are usable

    An account application does not by itself resolve a missing, abandoned, undersized or damaged physical service line.

  6. 6

    Get project-specific instructions before excavation

    If the Board says a new tap, replacement service or public-street work is required, follow the connection and permit workflow below.

Do not assume the application PDF is the only requirement for new construction.

A new physical water connection can require separate Water Board, Buildings Department and Department of Public Works approvals.

04

New tap / service line

How to Get a New Mount Vernon Water Service Connection

!
Water-main taps must comply with Board of Water Supply rules.

Mount Vernon’s municipal code separately requires water service work in public property to comply with Department of Public Works rules and Board of Water Supply requirements.

1 Verify main & service Board of Water Supply
2 Design connection Size + route
3 Plumbing permit Buildings
4 Street permit If ROW opened
5 Board tap approval Water requirements
6 Install & inspect Restore surface

Connection checklist

01 Confirm a City water main serves the property
02 Determine whether an old service can be reused
03 Confirm proposed service size
04 Use a properly licensed plumbing contractor
05 Obtain the plumbing permit
06 Obtain street-opening authorization if required
07 Follow Board tap specifications
08 Coordinate meter requirements
09 Complete inspections before closing work
05

2026 municipal requirements

What Mount Vernon Code Says About Water Service Lines

§ 227-30(A)

Public-property work follows DPW rules

Installation and repair of water service lines in a public street, highway, easement or other public property must comply with Department of Public Works rules and specifications.

§ 227-30(B)

Water Board rules also apply

Tapping a water main and installing or repairing water service lines must also conform to Mount Vernon Board of Water Supply rules and regulations.

2026 amendment

Recheck street-opening requirements

Mount Vernon’s Chapter 227 received a 2026 amendment concerning construction, sewer connections, drains, water mains and obstructions. Contractors should use the current code rather than an older permit checklist.

Current Mount Vernon municipal code

Review Article VI, “Connections to Sanitary Sewers, Stormwater Drains and Water Mains.”

Open Article VI
06

Construction approvals

Mount Vernon Water Connection Permits

A

Plumbing Permit

A new water connection is listed as a chargeable item under the City’s Plumbing Permit fee schedule.

Plumbing filing fee $125
Water connection $250
Letter of completion $100

Fixture-based and other permit charges can also apply depending on project scope.

Buildings Forms & Fees
B

Street-Opening Permit

Water service installation, repair or leak work within the public right-of-way is listed in the City’s street-opening permit schedule.

Water service installation category Type B
Type B permit fee $700
Deposit $5,000*

The code schedule also identifies a qualifying $100,000 annual surety bond alternative in the Type B category. Confirm the correct bonding/deposit arrangement with DPW.

Street Opening Code
Do not add $125 + $250 + $700 and call that the total connection cost.

Those are verified City permit-related charges, not a complete project quote. The total can also include Water Board tap requirements, plumber labor, service pipe, curb work, pavement restoration, meter work, engineering, bonding and other project-specific expenses.

07

Budget correctly

How Much Is a New Mount Vernon Water Connection in 2026?

The reviewed Water Department page does not publish one universal all-in tap price.

The physical cost depends on the connection, location, permit requirements, excavation and service-line work. Get a Board-specific connection requirement and contractor quote rather than relying on one generic “water hookup fee.”

Plumbing filing fee $125 Current City permit page
Water connection permit item $250 Plumbing fee schedule
Completion letter $100 When applicable
Type B street opening $700 Water service category

Other costs to ask about before construction

Board of Water Supply tap / connection charge Ask the Board for the current project-specific requirement.
Licensed plumber Excavation, pipe, fittings, valves and connection preparation.
Street restoration Pavement, sidewalk, curb or other right-of-way restoration.
Meter-related work Confirm required meter size and installation conditions with the Board.
Backflow equipment May apply to qualifying commercial, multifamily or cross-connection conditions.
Engineering / plans Can apply to larger or more complex properties and backflow systems.
08

Critical ownership boundary

Who Is Responsible for the Mount Vernon Water Service Line?

Board of Water Supply

Water Main → Curb Valve

The Water Department says it investigates service-line leaks and repairs leaking services from the water main to the curb valve.

  • Public water main
  • Board-side service segment
  • Main-to-curb leak investigation
Property / Customer

Curb Valve → Meter

The City’s Water Department page states that the customer is responsible from the curb valve to the meter.

  • Customer-side service line
  • Private-side repair responsibility
  • Contractor / permit coordination
This boundary is important when buying a property.

If an inspection shows an old, leaking or lead customer-side service line, ask whether the needed work is private-side repair, Board-side work or part of a current lead-service-line program before accepting a contractor quote.

09

Before reusing an older service

Lead Service Lines & New Connection Planning

Step 1

Ask what material is recorded

Mount Vernon’s water system has been conducting service-line inventory work. Before reusing an older service, ask whether the Board has a recorded material classification for both the public and customer sides.

Step 2

Do not bury an unresolved issue

If the street or service line will already be opened, clarify whether lead, galvanized or unknown material must be replaced under current requirements.

Step 3

Coordinate before contractor mobilization

Public-side and private-side responsibilities can differ. Confirm who is performing each portion before excavation begins.

Useful question for the Water Board:

“What service-line material does your inventory show for this property, and does the proposed new-service or repair project trigger any replacement requirement?”

10

Commercial / multifamily considerations

Backflow Prevention for New Mount Vernon Water Service

1 Board determines need
2 Hire NYS design professional
3 Submit application packet
4 Board endorsement
5 County health review

Who prepares the packet?

The City’s cross-connection guidance says a New York State licensed professional engineer or registered architect is needed to prepare the applicable backflow application packet.

Does installation need a permit?

Yes. The City states that installation of backflow prevention devices requires a plumbing permit from the Mount Vernon Department of Buildings.

Cross-Connection Control Program

Check Board requirements before finalizing a commercial or multifamily connection design.

Backflow Program
11

Meter setup

Mount Vernon Water Meter Responsibility

Board function

Meter maintenance

The Board of Water Supply says it maintains or replaces water meters to ensure accurate billing.

Before connection

Confirm meter size

For a new connection, do not select a meter or design the service solely from building pipe size. Confirm Board requirements for the intended demand.

After activation

Meter drives billing

The Water Department reads meters, generates bills and investigates unusually high or low usage.

12

Current department posting

Mount Vernon Water Rate Shown in 2026

Posted usage rate $4.30 per 100 cubic feet
Minimum charge $64.50 for usage up to 1,500 cubic feet
Rate effective date Jan. 1, 2025 still displayed on Water Department page during 2026 review
Connection cost and water rate are different.

The consumption rate is what the customer pays for water service after activation. It should not be confused with construction, tap, plumbing or street-opening charges required to create the connection.

13

After service starts

Mount Vernon Water Account & Online Billing

Temporary eBill notice:

The online portal currently displays a notice that electronic bill delivery is temporarily suspended during system updates, while online payment remains available. Customers enrolled in paperless billing are being sent paper bills during the suspension.

14

No water / active leak

Mount Vernon Water Emergency Phone Numbers

Water Department leak / no-water line (914) 668-7820 The Water Department specifically directs customers here for emergency leaks or lack of water.
Department directory also lists (914) 662-2103 as an Emergency Phone number.
Main break Call Water Department
No water Call Water Department
Leak before curb valve Board-side investigation
Leak after curb valve Private-side responsibility may apply
High / low bill Ask Board to review usage
Hydrant issue Contact Water Department
15

2026 system maintenance

2026 Hydrant Flushing & Temporary Water Changes

2026 program confirmed The Mount Vernon Water Department published a 2026 Hydrant Flushing Program.

Hydrant flushing helps remove sediment and test the distribution system. Customers can sometimes notice temporary discoloration or pressure changes during nearby flushing.

If water looks discolored

  • Check whether flushing is occurring in your area.
  • Avoid washing light-colored laundry until water clears.
  • Run a cold-water tap as directed by the Water Department.
  • Call the Board if discoloration does not clear.

2026 schedule

The City published a section-by-section flushing schedule for May 2026, including both daytime and overnight flushing periods.

View 2026 Schedule
16

Phone, address & hours

Mount Vernon Water Department Contact Information

Board of Water Supply

Water Department Customer Office

City Hall
1 Roosevelt Square, Room 2
Mount Vernon, NY 10550

Phone: (914) 668-7820
Hours: Monday–Friday, 8:30 AM–4:30 PM

Open Map
Payment mailing

Board of Water Supply

P.O. Box 271
Mount Vernon, NY 10551-0271

Use the payment stub when mailing a standard water payment to this P.O. Box.

Water service / billing (914) 668-7820
City Hall main (914) 665-2300
Buildings (914) 665-2483
17

In-person service

Map to Mount Vernon Board of Water Supply

Office Board of Water Supply
Location City Hall · Room 2
Hours Mon–Fri · 8:30–4:30
18

When the project gets stuck

Mount Vernon New Water Service Troubleshooting

Problem Best Next Step
Just bought an existing house Ask the Board whether the existing service/meter can be activated before starting a new-tap project.
No water line appears to serve the property Contact the Board before permit filing to confirm main availability and tap requirements.
Contractor says street must be opened Confirm DPW Type B street-opening requirements, deposit/bond and restoration standards.
Need plumbing permit Use Department of Buildings forms; the current fee page lists a $125 filing fee and $250 water-connection item.
Leak between main and curb valve Call the Board; the Water Department identifies this segment as its repair responsibility.
Leak from curb valve toward meter Customer-side repair responsibility may apply; coordinate a properly permitted plumber.
Older service may contain lead Ask the Board for service-line inventory information before reusing or replacing the connection.
Commercial project requires backflow Follow the Board’s cross-connection application and County Health review workflow.
No water after connection / activation Call the Water Department at (914) 668-7820.
19

One-minute action guide

What Should You Do Next?

20

Understand the project

Mount Vernon Water Connection Terms

Board of Water Supply
The City of Mount Vernon entity responsible for the municipal drinking-water system.
Water Main
The public distribution pipe that carries drinking water through the City’s water system.
Service Tap
The connection between a property water service and a public water main.
Service Line
The pipe carrying water from the public distribution system toward the building.
Curb Valve
The service shutoff point that also marks an important maintenance-responsibility boundary in Mount Vernon’s published guidance.
Water Meter
The measuring device maintained or replaced by the Board for accurate water billing.
Street-Opening Permit
Authorization required for qualifying excavation or utility work within public streets or rights-of-way.
Backflow Preventer
A device designed to prevent potentially contaminated water from flowing backward into the public drinking-water system.
Lead Service Line
A water service line made partly or fully from lead, requiring special inventory and replacement consideration.
Application for Service
The official Board of Water Supply form linked by the City for requesting water service.
21

Primary resources

Official Mount Vernon Water Connection Resources

22

10 new-service questions

Mount Vernon Water Department New Service FAQs

1. How do I start water service in Mount Vernon, New York?

Start with the Mount Vernon Board of Water Supply’s official Application for Service, which is linked from the City’s Water Department page. If the property already has a usable water connection and meter, the Board can advise what is needed to activate or establish service. Call (914) 668-7820 if you are unsure whether physical connection work is required.

2. Do I need a new water tap when buying an existing Mount Vernon property?

Not necessarily. An existing property may already have a Board of Water Supply tap, service line, curb valve and meter. Ask the Board to confirm the property’s service status before paying for a new connection or excavation.

3. Who makes water taps in Mount Vernon?

The Mount Vernon Water Department states that the Board of Water Supply makes taps for domestic and industrial customers. Mount Vernon code also requires water-main taps and water service-line work to comply with Board of Water Supply rules in addition to Department of Public Works requirements.

4. What permits are required for a new Mount Vernon water connection?

A physical connection can require a plumbing permit and, when public street or right-of-way work is involved, a street-opening permit. The project must also comply with Board of Water Supply connection requirements. Larger or specialized projects can have additional approvals.

5. How much is the Mount Vernon plumbing permit for a water connection?

The City’s current Buildings fee page lists a $125 plumbing filing fee and a separate $250 water-connection charge. It also lists a $100 letter-of-completion fee. Fixture and other project-specific charges can be additional, so these amounts should not be treated as the total cost of a new water service.

6. How much is a street-opening permit for a new water service?

The City’s current street-opening schedule places water service leak, repair and installation work in the Type B category. The schedule lists a $700 permit fee and a $5,000 deposit, with a qualifying $100,000 annual surety-bond option identified in the code. Confirm the correct requirement with DPW for your contractor and project.

7. Who is responsible for a leaking Mount Vernon water service line?

The Water Department says the Board investigates and repairs leaking services from the water main to the curb valve. The customer is responsible for the service from the curb valve to the meter.

8. What is the Mount Vernon water rate in 2026?

The Water Department page reviewed in August 2026 still displays the rate change effective January 1, 2025: $4.30 per 100 cubic feet with a minimum charge of $64.50 for usage up to 1,500 cubic feet. Verify the latest bill or Board notice before budgeting long-term operating costs.

9. What is the Mount Vernon Water Department phone number?

The Board of Water Supply phone number is (914) 668-7820. The customer office is at City Hall, 1 Roosevelt Square, Room 2, Mount Vernon, NY 10550. The Water Department page lists in-person payment hours as Monday through Friday from 8:30 AM to 4:30 PM.

10. What number do I call for no water or an emergency leak in Mount Vernon?

The Water Department specifically directs customers with emergency leaks or lack of water to call (914) 668-7820. The department contact listing also identifies (914) 662-2103 as an emergency phone number.